>> Nature Journal >> 2024 >> Issue 4 >> 正文
Evolution and control of deviatoric stress in surrounding rock of gob-side entry in deep island filling work face
Author: XING Shikun, LI Hui, FENG Shaohua Time: 2024-07-05 Counts:

XING S K, LI H, FENG S H .Evolution and control of deviatoric stress in surrounding rock of gob-side entry in deep island filling work face[J].Journal of Henan Polytechnic University(Natural Science) ,2024,43(4):39-47.

doi:10.16186/j.cnki.1673-9787.2023030065

Received:2023/03/27

Revised:2023/07/10

Published:2024/07/05

Evolution and control of deviatoric stress in surrounding rock of gob-side entry in deep island filling work face

XING Shikun1,2, LI Hui3, FENG Shaohua3

1.School of Energy Science and EngineeringHenan Polytechnic UniversityJiaozuo  454000HenanChina;2.Xingdong MineJizhong Energy Group Co.Ltd.Xingtai  054000HebeiChina;3.School of Energy and Mining EngineeringChina University of Mining & Technology-BeijingBeijing  100083China

Abstract: Objectives To solve the problem of surrounding rock control in the gob-side driving roadway of the deep island filling working face  Methods taking the 12216 material haulage roadway of Xingdong Mine as the backgroundthe FLAC3D numerical simulation software was used to study the distribution law of the deviatoric stress in the surrounding rock of the gob-side driving roadway under different filling rates in the goaf on both sides of the island face.Additionallythe evolution characteristics of deviatoric stress in the surrounding rock of the front section of the working face under the influence of dynamic pressure during the filling mining of the island working face were simulated and analyzed.  Results The results showed that:(1The coal pillar side of the roadway driven along the goaf in the island face was greatly affected by the filling effect of the side goaf.The increase in the filling rate of the side goaf made the peak area of deviatoric stress on the coal pillar take on an elliptical shape and gradually transfer to the side of the goaf.2Island filling formed an arc low-value zone towards the side of the goaf in the deviating stress field of the top and bottom of the roadway along the goaf.3During the period of dynamic pressure disturbance of island fillingthe maximum deviator stress zone was located on the side of solid coal about 8 m away from the working faceabout 4.3 m away from the roadway and the peak value could reach 34 MPa.  Conclusions Combined with the results of numerical simulation analysisthe cooperative support mode of “high-strength bolt+large-diameter and high-elongation anchor cable” was proposed.Field engineering practice showed that the surrounding rock control effect of the goaf roadway was good.

Key words:filling mining;gob-side entry driving;deviatoric stress;surrounding rock control;island work face