Research on multi-objective green job shop scheduling problem based onimproved NSGA-Ⅱ

WEN Xiaoyu, SUN Haiqiang, LI Hao, QIAO Dongping, XIAO Yanqiu, CAO Yang

Henan Key Laboratory of Intelligent Manufacturing Mechanical EquipmentZhengzhou University of Light IndustryZhengzhou 450002 Henan China

Abstract:For multi-objective green job shop scheduling problem GJSP a multi-objective GJSP model was established with makespan total carbon emissions and total tardiness as objectives. An improved NSGA-Ⅱ algorithm was proposed to solve the problem. The total carbon emissions objective function was designed in the model considering the carbon emissions during machine adjustment status caused by job fixture replacement and a local search strategy based on N5 neighborhood structure and non-dominated sorting was designed. Finally some instances of GJSP were designed to test the proposed algorithm. The calculation results showed that for the optimization of multiple objective functions the improved NSGA-Ⅱ found that the equilibrium solution had a relatively higher non-dominated level. For the optimization of a single objective function the objective function value is relatively lower. The research showed that the improved NSGA-Ⅱ had better optimization effect. The experimental results verified the effectiveness of the proposed algorithm.

Key words:green manufacturing;job shop scheduling;multi-objective optimization;carbon emission;N5 neigh borhood structure