供稿: 陆明心 | 时间: 2019-05-20 | 次数: |
作者:陆明心
作者单位:中国矿业大学(北京)矿业工程系
摘要:对不同地质及开采条件下的采煤工作面上覆岩层的活动进行了UDEC数值模拟,发现工作面上覆岩层平衡结构层位与采高及一次采出煤层厚度并不存在线性关系.所形成的平衡结构有两类,即稳定平衡结构和似平衡结构.文中给出了确定合理支架工作阻力的计算公式,并在水峪矿7103工作面及成庄矿3308工作面支架工作阻力确定中进行了应用.
DOI:10.16186/j.cnki.1673-9787.2005.04.005
分类号:TD355
The Digital method for Calculating the Rational Support Capacity in a Coal Mining Workface
Abstract:This paper analyzes the results of the UNDEC simulation for surrounding rock displacement of a mining workface.The results indicate that with differing geology and technical conditions, the balanced structural position is not linear with the mining height.The two types of balanced structures consist of a stable structure and a seemingly stable structure.The author provides the calculation formula for the rational support capacity and applies it to workface 7103 in Shuiyu Colliery and workface 3308 in Chengzhuang Colliery.