>> Nature Journal >> 2023 >> Issue 6 >> 正文
Elastoplastic solutions of deep-buried circular tunnels under the coupled effect of seepage damage
Author: WANG Gang1,2, GUAN Hui1,2, WANG Pengju1,2, YUAN Wenpeng1,2, ZHANG Shubo1,2, HE Peng1,2, CHEN Huiyuan Time: 2023-11-10 Counts:

WANG G, GUAN H, WANG P J, et al.Elastoplastic solutions of deep-buried circular tunnels under the coupled effect of seepage damage[J].Journal of Henan Polytechnic University(Natural Science) ,2023,42(6):173-181.

doi:10.16186/j.cnki.1673-9787.2022040016

Received:2022/04/07

Revised:2022/06/30

Published:2023/11/25

Elastoplastic solutions of deep-buried circular tunnels under the coupled effect of seepage damage

WANG Gang1,2, GUAN Hui1,2, WANG Pengju1,2, YUAN Wenpeng1,2, ZHANG Shubo1,2, HE Peng1,2, CHEN Huiyuan1,2, LIU Tingfang1,2

1.College of Civil EngineeringShandong University of Science and TechnologyQingdao  266590ShandongChina;2.Shandong Provincial Key Laboratory of Civil EngineeringDisaster Prevention and MitigationShandong University of Science and TechnologyQingdao  266590ShandongChina

Abstract:In order to study the elastoplastic solution of deeply buried circular tunnels considering seepage damage coupling factorsthis paper selects the Drucker-Prager yield criterion and deduces elastoplastic solution of deeply buried circular tunnels with lining support in the stages of construction and operation based on the Biot effective stress principle.Moreoverthe formulas of plastic radius and lining surrounding rock stress are deducedand the effects of different factors on plastic radius and lining surrounding rock stress are analyzed the formulas for the plastic radius and lining surrounding rock stress are given.The results show thatin the construction stagethe surrounding rock damage promotes the expansion of the plastic zoneat the same timethe plastic radius is positively correlated with the seepage forceand the hoop stress appears abruptly at the junction of the lining and the surrounding rock and finally tends to the crustal stress.In the operation stagethe plastic radius and the damage factor show a linear increaseand show a negative correlation trend with the seepage force.The effect of internal pressure on the plastic radius is divided into five stages.With the further increase of internal pressurethe plastic radius can be divided into five stageslow internal pressure stagemedium-low internal pressure stagefirst high internal pressure stagesecond high internal pressure stageand high internal pressure stage.The above results provide guidance and help for the construction of deep-buried circular tunnel engineering.

Key words:circular tunnel;Drucker-Prager yield criterion;seepage damage coupling;lining support;elastoplastic solution

  022_2022040016_王刚_L.pdf

Lastest