Research on optimization method for excavation sequence of deep chamber group
Author: ZANG Jincheng,LI Dghao,ZHANG Lu,SUN Lingfeng,HUANG Yubing Time: 2024-09-28 Counts:

ZANG J CLI D HZHANG Let al.Research on optimization method for excavation sequence of deep chamber groupJ.Journal of Henan Polytechnic UniversityNatural Science),doi:10.16186/j.cnki.1673-9787.2023100063

doi: doi:10.16186/j.cnki.1673-9787.2023100063

Received2023-10-30

Revised2024-03-08

Online2024-09-28

Research on optimization method for excavation sequence of deep chamber group

ZANG Jincheng1LI Donghao2ZHANG Lu1SUN Lingfeng2HUANG Yubing2

1.Wanfu Energy Company Limitied of Yanzhou Coal Heze 274922 Shandong China2.State Key Laboratory for Geo-mechanics and Deep Underground Engineering China University of Mining & Technology Beijing), Beijing 100083 China

Abstract: [Objective] In order to reduce the mutual disturbance caused by excavation of deep chambers, [Methods] This paper taked Wanfu Coal Mine a coal mine under construction in the extremely thick alluvium as the engineering background. Established quantitative evaluation indicators such as surrounding rock characterization deformation and cavern excavation mutual disturbance degree. Based on the overall optimization principle of " the overall deformation of chamber group is the main factor and the mutual interference degree of excavation between roadways is the secondary factor " a method for evaluating and optimizing the excavation sequence of deep chamber group was proposed. Numerical experimental studies on excavation of deep chamber alone and excavation sequence of chamber groups are carried out. [Results] The characteristic deformation of belt head roadway is 416.2 mm and that of main shaft contact roadway is only 58.6 mm. The total interference degree of excavation is 286.38 in scheme 3 and 456.20 in Scheme 5 which is reduced by 37.22% compared with Scheme 5. By using this evaluation and optimization method it is determined that the overall surrounding rock deformation and excavation disturbance of the chamber group in Scheme 3 are the smallest which is the best excavation scheme. The weighted total score of this scheme is 11 and the sum of the characteristic deformation increments of each chamber is 178 mm and the excavation interference is reduced by 30.26% compared with the largest excavation scheme. The scientific validity of the method has been verified. [Conclusion] It is found that the deformation of the chamber has the characteristic of non-uniformity. The larger the section size of the chamber the more obvious the unloading of surrounding rock and the greater the degree of stress release are clarified. The optimal excavation scheme of deep chamber group in Wanfu Coal Mine is determined by evaluation and optimization method.

Key words: deep chamber groupoptimization of excavation sequencesurrounding rock characterization deformationexcavation interference degreeevaluation and optimization method