Angle compensation and correction technology based on the offset law of cross-seam borehole
Author: JI Chaohui Time: 2023-07-10 Counts:

JI C H.Angle compensation and correction technology based on the offset law of cross-seam borehole[J].Journal of Henan Polytechnic University(Natural Science) ,2023,42(4):34-39.

doi:10.16186/j.cnki.1673-9787.2023010027

Received:2023/01/16

Revised:2023/04/20

Published:2023/07/25

Angle compensation and correction technology based on the offset law of cross-seam borehole

JI Chaohui1,2

1.State Key Laboratory of the Gas Disaster DetectingPreventing and Emergency ControllingChongqing  400037China;2.Chongqing Research InstituteChina Coal Technology and Engineering GroupChongqing  400037China

Abstract:In view of the general offset during drilling cross-layer extraction boreholewhich results in large deviation between the actual meeting coal point and the design pointand extraction blind zone in pre-degased coal seamtheoretical analysis and field test methods were used to study on deviation correction technology of the borehole.The drilling trajectory data measured by the drilling trajectory instrument was used to fit the linear relationship formula between the deviation values of pitch angle and azimuth angle and borehole depth by use of the least squares methodand the law of borehole offset was obtained.Based on the borehole offset lawa technology of angle compensation correction was proposed to provide guidance for correcting the construction parameters of subsequent or supplementary borehole.When the hole was drilledthe design depth of borehole was substituted into the linear relationship formulathe pitch angle and azimuth deviation angle at the meeting coal point were calculatedand the deviation angle was increased in reverse to ensure that the actual meeting coal point falled at the design point.According to the field practice of the correction technologythe azimuth deviation value of the actual meeting coal point of the borehole reduced to 0.68°and the pitch angle deviation value droped down to 0.76°which was basically the same with the design position.It showed that the angle compensation method was feasible and reliable based on the borehole offset lawand met the requirements of engineering practice accuracy.

Key words:borehole offset law;angle compensation method;borehole correction deviation technology;regional pre-drainage of cross-seam borehole