Time: 2021-11-10 | Counts: |
doi:10.16186/j.cnki.1673-9787.2020090083
Received:2020/09/18
Revised:2021/03/22
Published:2021/11/15
Study on the technology of gob-side entry retaining by roof cutting to release pressure in fully mechanized mining working face with high stress
ZHENG Lijun 1, WANG Wen 2, ZHANG Guangjie 3
1.Guhanshan Coal Mine, Henan Coking Coal Energy Co. , Ltd. , Jiaozuo 454000 , Henan, China;2.School of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo 454000 , Henan, China;3.Henan Institute of Technology, Henan Polytechnic University, Jiaozuo 454000 , Henan,China
Abstract:To research the gob-side entry retaining mining technology under special geological conditions such as large buried depth , high stress and hard roof , taking the 1604 fully mechanized working face of Guhanshan coal mine of Henan Coal Energy Co. ,Ltd.as the engineering geological background , based on the combination of theoretical analysis and numerical simulation , the movement law of gateway roof was studied , the key parameters of gob-side entry retaining were determined , and the engineering test was carried out on site. The results showed that: The directional presplitting blasting could block the stress transmission of the basic rock above the gateway and goaf , and achieved the purpose of pressure relief and presplitting , When the cutting height was 12.3 m , the lower key strata could be cut off; The average roof subsidence of gob-side entry retaining was 256 mm , the average wall displacement of goaf was 214 mm, and the surrounding rock of gob-side entry retaining tended to be stable after 110 m behind the working face, which could meet the requirements of safety production. The research results could provide technical reference for gob-side entry retaining mining under similar geological conditions.
Key words:fully mechanized mining working face;roof cutting to release pressure;gob-side entry retaining;directional presplitting blasting key strata;surrounding rock control;numerical simulation