>> 自然科学版 >> 网络首发 >> 正文
深部孤岛充填工作面沿空掘巷围岩偏应力演化与控制
供稿: 邢世坤,李辉,冯少华 时间: 2024-05-09 次数:

邢世坤,李辉,冯少华.深部孤岛充填工作面沿空掘巷围岩偏应力演化与控制[J.河南理工大学学报(自然科学版),10.16186/j.cnki.1673-9787.2023030065

XING S KLI HFENG S H.Evolution and control of deviatoric stress in surrounding rock of gob-side entry in deep island filling faceJ.Journal of Henan Polytechnic UniversityNatural Science

doi:10.16186/j.cnki.1673-9787.2023030065

深部孤岛充填工作面沿空掘巷围岩偏应力演化与控制(网络首发)

邢世坤12,李辉3,冯少华3

1.河南理工大学 能源科学与工程学院,河南 焦作 4540002.冀中能源股份有限公司 邢东矿,河北 邢台 0540003.中国矿业大学(北京) 能源与矿业学院,北京 100083

摘要: 目的 为解决深部孤岛充填工作面沿空掘巷围岩控制问题, 方法 以邢东矿12216运料巷为背景,采用FLAC3D数值模拟软件,研究孤岛面临侧采空区在不同充填率条件下沿空掘巷围岩偏应力分布规律,模拟分析孤岛工作面充填开采时,工作面超前段围岩受动压影响时的偏应力演化特征。结果 结果表明:(1)孤岛工作面沿空掘巷巷道煤柱帮受临侧采空区充填效应影响较大,临侧采空区充填率增加使煤柱上偏应力峰值区呈“椭圆”形并逐步向采空区侧转移;(2)孤岛充填工作面沿空掘巷顶底板偏应力场形成一个朝向采空区侧的弧形低值带;(3)孤岛充填动压扰动时期最大偏应力区位于实体煤一侧,距工作面前方8 m左右,距巷道4.3 m左右,峰值可达34 MPa结论结合数值模拟分析结果,提出采用“高强度锚杆+大直径高延伸率锚索”协同支护方式,现场工程实践表明,沿空巷道围岩控制效果良好。

关键词: 充填开采;沿空掘巷;偏应力;围岩控制;孤岛工作面

doi: 10.16186/j.cnki.1673-9787.2023030065

基金项目: 国家自然科学基金资助项目(52074296

收稿日期:2023-03-27

修回日期:2023-07-10

网络首发日期:2024-05-09

Evolution and control of deviatoric stress in surrounding rock of gob-side entry in deep island filling face (Online)

XING Shikun12LI Hui3FENG Shaohua3

(1.School of Energy Science and EngineeringHenan Polytechnic UniversityJiaozuo 454000HenanChina2.Xingdong MineJizhong Energy Group Co.Ltd.Xingtai 054000HebeiChina3.School of Energy and Mining EngineeringChina University of Mining & Technology-BeijingBeijing 100083China)

Abstract: Objectives To solve the problem of surrounding rock control in the gob-side driving roadway of the deep island filling working face Methods taking the 12216 material haulage roadway of Xingdong Mine as the backgroundthe FLAC3D numerical simulation software is used to study the distribution law of the deviatoric stress in the surrounding rock of the gob-side driving roadway under different filling rates in the goaf on both sides of the island faceand to simulate and analyze the evolution characteristics of the deviatoric stress in the surrounding rock of the front section of the working face under the influence of dynamic pressure during the filling mining of the island working face. Results The results showed that:(1The coal pillar side of the roadway driven along the goaf in the island face is greatly affected by the filling effect of the side goaf.The increase of the filling rate of the side goaf makes the peak area of the deviatoric stress on the coal pillar take on an 'ellipse' shape and gradually transfer to the side of the goaf.2Island filling forms an arc low-value zone towards the side of the goaf in the deviating stress field of the top and bottom of the roadway along the goaf.3During the period of dynamic pressure disturbance of island fillingthe maximum deviator stress zone is located on the side of solid coalabout 8 m away from the working faceabout 4.3 m away from the roadwayand the peak value can reach 34 MPa. Conclusions Combined with the results of numerical simulation analysisthe cooperative support mode of high-strength bolt+large-diameter and high-elongation anchor cable is proposed.The field engineering practice shows that the surrounding rock control effect of the goaf roadway is good.

Key words:filling mininggob-side entry drivingdeviatoric stresssurrounding rock controlisland coalface

 

最近更新